Moving right along…….
Been a little lagging in getting a house update on the blog….mostly because I wasted a lot of energy trying to figure out how to upload a video that my dad took of him and Blake breaking and entering into the house one rainy day (as you’ll notice – I never figured it out) Cute as the video was, I was really trying to post it because in this state, it’s tough to get a feeling for the house layout from still pictures, but a video really shows you how the space feels when you walk around – and who wouldn’t love to have Blake as their tour guide?
Anyway – here are a lot of pics from a few collected visits. Next time we visit I’ll hopefully be able to get a video but we may have drywall up at that point…which will just be crae- crae
In case you’re keeping track, here is a list of the last few things that went into the house after framing:
- Plumbing
- HVAC
- Electrical
- Cable/Ethernet Rough Ins
- Our basement slab has also been poured but due to a water issue I wasn’t able to get down there